I know from previous information provided by McMaster Parking that the busiest parking time was 1pm on Tuesdays. That data was from 2011. Work is underway to study the parking situation to develop a Transportation Demand Management plan and those people will have access to parking data, but still I felt the need/desire to go look for myself.

Right now McMaster has agreed not to repave a section of Lot M (would hold about 200 cars) after some professors made a plea to use the redundant parking area as an outdoor laboratory to study and practice wetland rehabilitation. McMaster left it as gravel, painted some yellow parking stalls, and have it for peak/overflow parking. The argument to keep it as parking is pretty weak, as you will see, so hope for McMarsh remains strong.

I set out on my bicycle to check out the parking lot at peak. As I crested the hill at about 1:05pm the lot looked busy, but as I got closer any fears I had that the overflow lot was busy evaporated.

There was one car there, beside 3 empty school buses. 1:10pm. That's it.

And then I went to the adjacent paved lot (to the left in the photo), and videotaped as I rode up and down the two nearest aisles to record the number of empty parking spaces: 52 empty stalls.


Keep in mind, too, that another section of the parking lot (Lot O) is closed temporarily (for a couple years) to house the daycare centre in portables while a new building is constructed on the main campus, plus the 30 metre buffer is in place. This was the worst case scenario for the parking office, yet it is working well by all appearances. It looks like they could easily do without the section of Lot M currently set aside for overflow. Home for McMarsh!



WORST CASE SCENARIO: not so bad!

MCMASTER CAPACITY STUDY APRIL 2011
TOTAL PARKING STALLS: 3963
PEAK DEMAND: 2803 vehicles
With no new numbers available for peak demand I'm assuming peak demand at 2803 vehicles (69% of supply), from the Campus Capacity study.

SCENARIO: Worst case for Parking (pd=peak demand)

30 Metre BUFFER (480 spaces lost) PLUS LOT O OUT OF COMMISSION (122 spaces lost)
3963-480=3483-122=3361
(pd@2803 is 83% of supply, or 558 extra spaces at peak)

Comments

artistonhpvs said…
I agree, yet to get down there again been a long time...I rather enjoy the good things like cycling and blading...I will post more again>>>

Popular posts from this blog

Taking a different direction to protect turtles in Cootes

Here's an easy thing you can do that will benefit at local risk-turtles immediately. It's as simple as taking a different route to bypass Cootes and Olympic Drive. This small choice will mean turtles and other wildlife in Cootes Paradise will have a better chance of surviving from being crushed under your vehicle tires.

Take the pledge: http://bit.ly/ProtectTurtlesCootes
Often you might not even be aware you've hit a young turtle, or a snake, for example, yet in the case of turtles, each death means this at-risk group is one death closer to extirpation. Turtles take a long time to reach maturity, and most hatchlings never make it to adulthood so you can see the dilemma.

Please take a minute to pledge your commitment to use an alternate route, and help Restore Cootes and other groups do their part to protect our reptile friends. A previous survey showed that 70% of respondents would do this for the turtles. Hopefully you will join them!

Thanks in advance for your support!


Loa…

The Social Sciences Take on Lot M!

Guest Blogger: Carly Stephens 
Since its inception, Parking to Paradise has been a platform for interdisciplinary collaboration. Many readers are familiar with the Ancaster Creek riparian buffer and restoration work along the Northwest border of the parking lot. Interested parties across many faculties and disciplines have worked together to restore this ecosystem and raise awareness about the impacts urbanization on the natural environment. Nurtured by the time, commitment and hard work donated by volunteers and students, the land has grown into a site of green infrastructure, ecosystem restoration, and sustainable development. Read about Reyna Matties' Master’s work on retrofitting storm water management systems on the lot in the December 7, 2015 post below. Now, it’s the social sciences turn to learn where green infrastructure developments - as with the case of Lot M - fits into our social world.

My research involves exploring the various roles that green space plays in our urb…

Coldspring Valley History Hike: Water Innovation Week

We're heading back out to share the history of this former floodplain/nature sanctuary, and take a look at the rehabilitated future of this contested site in McMaster's west campus. Can we really depave Paradise? It's happening!

Register on Eventbrite: http://bit.ly/waterweekwalk2017 (by donation)